Case Studies
U Store It - Ballymount

On this project we replaced a large unit of glass 4 stories from the ground. This was achieved using a 20m cherry picker with a crane mount and mechanical suckers. This work was carried out after 5pm, as the site is a hive of activity before then and we didn't want to close the access road while it was busy.
HSE Ambulance Base Finglas

A tv Provider was here fitting a unit when they drilled through the glass. We were then called in to pit a safety film up and get the glass replaced. As can be seen here the glass was replaced using a cherry picker in line with our completed risk assessment and method statement submitted to allow the works to be carried out safely.
Heritage glass replacement

At this property we had to replace a unit of glass in a heritage sliding sash window this was stripped out and replacement glass fitted using putty as it is in a conservation area.
High Rise Replacement glass

On this project we had to replace glass in the penthouse unfortunately this was 8 stories up and had to be fitted from outside to complete this project safely. We used a 51 meter cherry picker with a crane mounted to the basket to replace the glass. Due to the size of the truck it could only be parked on fire access routes as they have a heavier weight limit.
Holiday Inn Dublin City Centre

We were called here to replace 3 units that had broken and the glass had fallen to the street. We arranged all risk assessments, method statements and road control permits for cherry pickers. Again we used a 51 meter cherry picker with a crane mount in the basket to carry out the works.